Description
\'Change Order\' is one of the newest Hatteras GT59s available. She is broken in and ready for the next owner. This 3 stateroom, 2 head layout with the master aft and tackle room provides the comfort and fishability for long extended fishing excursions. The main deck layout has the preferred peninsula galley with subzero drawer fridges, range and a dinette to stbd. Also to stbd is a popup TV in the Satin teak cabinet and bottle storage with icemaker. The salon sofa has storage and a coffee table with storage that can raise to dining level.
Equipped with Cat C32s, she cruises at 30 knots and has a top end of 37 knots. These engines are still under Platinum Plus warranty until 2025 and can be extended further.
All new Garmin electronics package in 2022.
Characteristics
Interior Cabinetry In Satin Finished Teak
Leather Sofa With Storage And Pull Out Berth
Teak Coffee Table In High Gloss Teak With Flip Up Desk Style Top, Storage
Leather Dinette With Storage Under And High Gloss Teak Table
Carpet Flooring With Amtico Floor At Entry Door
Samsung 40\" Tv With Electric Lift In Teak Counter Fwd Of Dinette
Denon Salon Av/Receiver - Model avrx3600hbke3
Samsung Blue-Ray Player
Definitive Technology Subwoofer - Model Supercube 2000
Two Jenn-Air Drawer Fridges (2 Drawers Each) - Model judfp242hxo1
Miele 4 Burner Electric Cooktop - Model km56212
Sharp Microwave - Model R-1881lsy
U-Line Icemaker Opposite Galley - Model uln-B195cb-03a
Emerson Garbage Disposal In Stainless Steel Sink
Corian Blue Countertops
Storage Cabinets & Full Height Pantry
Amtico Flooring
- Bottle Storage In Bar Opposite Galley
- Large Doghouse Storage Forward Of Galley
MASTER STATEROOM AFT
Queen Berth with Storage
Cedar Lined Hanging Closet
Nightstands with Drawers
Cabinet Storage
TV & Soundbar Built in to Wall
Head with Separate Shower
Solid Surface Countertops
Mirorred Medine Cabinet
Tackle Room To Stbd
Lockable Storage For Rods/ Reels
Storage Cabinets
Bunk Stateroom To Stbd
Over Under Bunks
Nightstands With Storage For Both Berths
Cedar Lined Hanging Locker
Vi Stateroom
Queen Berth
Flip Up Bed With Storage Underneath
Cedar Lined Hanging Lockers
Storage Overhead In Bulkheads
Head With Separate Shower
Solid Surface Countertops & Floors In Head
Mirrored Medicine Cabinet
Companion Laundry
- Haier Full Size Vented Dryer (New in 2022)
- Haier Full Size Vented Washer (New in 2022)
- Wing board Rod Holders 3-Port, 3- Starboard
- Circulating Livewell with LED lighting in Transom Fish Box
- Lift Up Coaming Gate
- Companion Helm Chair Port Side
- High Gloss Teak Helm Pod
- 8 Cubic Foot Top Loaded Freezer on Flybridge
- Electric Bow Thruster
- Raw Water Wash Down Outlet
- Bow Stainless Anchor Shoot and Windlass
- Pipewelders Hardtop with Outriggers
- Eskimo Ice chipper Feeds into Stbd Deck Fishbox
- Swim Platform
- Electric Grill in Cockpit
- Fresh Water Washdown Bow Locker
- Gunnel Racks for Storage
- Teak Covering Boards in Cockpit
- Lumitec Sea Blaze Underwater Lights
You are using an outdated browser. Please upgrade your browser or activate Google Chrome Frame to improve your experience.
- Link to search page
- US: +1 (561) 833 4462
- US: +1 (206) 209-1920
- MC: +377 99 90 74 63
CHANGE ORDER Yacht for Sale
Change Order Yacht for Sale - 59' Hatteras
Open Gallery
Contact Us For More Information
Detailed information.
Content Sections
Interior Cabinetry In Satin Finished Teak
Leather Sofa With Storage And Pull Out Berth
Teak Coffee Table In High Gloss Teak With Flip Up Desk Style Top, Storage
Leather Dinette With Storage Under And High Gloss Teak Table
Carpet Flooring With Amtico Floor At Entry Door
Samsung 40" Tv With Electric Lift In Teak Counter Fwd Of Dinette
Denon Salon Av/Receiver - Model avrx3600hbke3
Samsung Blue-Ray Player
Definitive Technology Subwoofer - Model Supercube 2000
Two Jenn-Air Drawer Fridges (2 Drawers Each) - Model judfp242hxo1
Miele 4 Burner Electric Cooktop - Model km56212
Sharp Microwave - Model R-1881lsy
U-Line Icemaker Opposite Galley - Model uln-B195cb-03a
Emerson Garbage Disposal In Stainless Steel Sink
Corian Blue Countertops
Storage Cabinets & Full Height Pantry
Amtico Flooring
- Bottle Storage In Bar Opposite Galley
- Large Doghouse Storage Forward Of Galley
Accommodations
MASTER STATEROOM AFT
Queen Berth with Storage
Cedar Lined Hanging Closet
Nightstands with Drawers
Cabinet Storage
TV & Soundbar Built in to Wall
Head with Separate Shower
Solid Surface Countertops
Mirorred Medine Cabinet
Tackle Room To Stbd
Lockable Storage For Rods/ Reels
Storage Cabinets
Bunk Stateroom To Stbd
Over Under Bunks
Nightstands With Storage For Both Berths
Cedar Lined Hanging Locker
Vi Stateroom
Queen Berth
Flip Up Bed With Storage Underneath
Cedar Lined Hanging Lockers
Storage Overhead In Bulkheads
Head With Separate Shower
Solid Surface Countertops & Floors In Head
Mirrored Medicine Cabinet
Companion Laundry
- Haier Full Size Vented Dryer (New in 2022)
- Haier Full Size Vented Washer (New in 2022)
Deck Equipment
- Wing board Rod Holders 3-Port, 3- Starboard
- Circulating Livewell with LED lighting in Transom Fish Box
- Lift Up Coaming Gate
- Companion Helm Chair Port Side
- High Gloss Teak Helm Pod
- 8 Cubic Foot Top Loaded Freezer on Flybridge
- Electric Bow Thruster
- Raw Water Wash Down Outlet
- Bow Stainless Anchor Shoot and Windlass
- Pipewelders Hardtop with Outriggers
- Eskimo Ice chipper Feeds into Stbd Deck Fishbox
- Swim Platform
- Electric Grill in Cockpit
- Fresh Water Washdown Bow Locker
- Gunnel Racks for Storage
- Teak Covering Boards in Cockpit
- Lumitec Sea Blaze Underwater Lights
IMAGES
COMMENTS
CHANGE ORDER. Description. Characteristics. SPECIFICATIONS. Type. Motor. Build. Hatteras. Hull. Fiberglass. Year. 2021. Cabins. 3. Length. 17.98m (59ft) Beam. 5.71m (19ft) Speed. 30 (Cruising) ASKING PRICE. €3,599,000. Contact a Broker. Peter Bennett. +33 609 96 01 02. E-MAIL. Image Gallery.
The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition. Call to inquire for more information or schedule a showing on “Change Order” the 2021 HATTERAS 59’ CONVERTIBLE GT59. Engine warranty until 12/7/2025 or 2,000hrs. HIGHLIGHTS. CAT C32A engines with warranty until 12/7/2025 or 2000 hours.
Change Order Yacht for Sale - 59' Hatteras. Type: Motorboat. Category: Sport Fisherman. Builder: Hatteras. Model: GT59. Condition: Used. Length: 59' (17.98m) Beam: 18' 9" (5.72m) Engines:2x CAT Inboard, 1,622hp. Speed (Cruising): 30 Knots/34 MPH. Speed (Max): 38 Knots/43.73 MPH. Draft: 4' 9" (1.45m) Model Year:2021. Build Year:2021.
The 2021 59' HATTERAS GT59 Sport Fisherman Change Order is a boat for sale located in Marathon, Florida, United States. 'Change Order' is one of the newest Hatteras GT59s available. She is broken in and ready for the next owner.
2020. Year. HATTERAS. Builder. 59' 1" (18.01m) Length. 3. Cabins. Change Order 2020 59' 1" HATTERAS Sport Fisherman. Stuart United States $3,199,000 USD. The 2021 59' 1" HATTERAS Sport Fisherman Change Order is a boat for sale located in Stuart, Florida, United States.